name, description, phase, model_requirement, can_edit, risk_level
name description phase model_requirement can_edit risk_level
implementation-slicer Convert a frozen requirement document or approved refactor scope into small implementation slices with file scope, modification order, validation commands, rollback notes, and done criteria. Use before coding non-trivial features or refactors. analysis reasoning true medium

Implementation Slicer

Use this skill to convert a requirement document into executable implementation slices.

When To Use

  • Use after requirements are frozen or refactor scope is approved.
  • Use before coding non-trivial features or refactors that need bounded slices.

Inputs Required

  • Frozen requirement document or approved refactor scope
  • Relevant boundary or workflow analysis when available
  • Active task selection from .task/active.json when writing artifacts

Steps

  1. Read the requirement document or approved refactor scope.
  2. Use module-inspector or workflow-inspector when module or workflow scope is unclear.
  3. Identify the smallest safe implementation slices.
  4. For each slice, define:
    • goal
    • allowed files, packages, or directories
    • forbidden files, packages, or directories
    • execution mode
    • gate class
    • risk score
    • gate reasons
    • dependencies and parallel eligibility when the task is complex
    • validation level
    • merge owner and conflict rule when shared files are involved
    • steps
    • validation command
    • done criteria
    • rollback notes
  5. Create or update .task/<task-id>/implementation-plan.md, where <task-id> is read from .task/active.json.
  6. Update .task/<task-id>/state.json if the caller asks you to record slices or gates.
  7. Use the active task directory selected by .task/active.json.
  8. Do not implement code.

Output Artifact

  • An implementation plan with bounded slices, validation guidance, and rollback notes in .task/<task-id>/implementation-plan.md
  • Optional task state update only when the caller asks to record slices or gates

Gate Class Rules

  • Use only this frozen gateClass vocabulary: simple, standard, boundary-sensitive, high-risk.
  • Emit risk_score as an integer from 1 to 5 for every slice or approved parallel group.
  • Emit gateReasons as short reason labels that explain why the slice should pause or may continue under the selected policy.
  • risk_score is stricter supplemental metadata, not a replacement for gateClass, required human gates, explicit stop conditions, or critic-required pauses.
  • When risk_score indicates higher risk than gateClass alone, preserve or strengthen the stop posture rather than weakening it.
  • Calibrate ordinary bounded standard slices toward risk_score 2-3 unless there is concrete elevated impact, reversibility concern, or validation uncertainty.
  • Use risk_score 4-5 only when the slice itself carries elevated safety, compatibility, production, data, security, cross-boundary, or validation risk.
  • Treat these as common higher-risk inputs when assigning or explaining risk_score: database schema updates, permissions or security logic, device communication, scheduling, externally committed public API compatibility, build or release scripts, code deletion, dependency upgrades, and production configuration.

Output Document Template

# <Task Name> Implementation Plan

## Requirement Source

## Scope Summary

## Involved Modules Or Areas

## Loaded Rules

## Loaded Docs

## Global Forbidden Scope

## Execution Strategy

- Complexity: simple | complex
- Default Execution: sequential
- Parallel Execution: optional | not-needed
- Fallback Execution: sequential
- Merge Owner:
- Conflict Resolution Rule:

## Slice Dependency Graph

| Slice | Depends On | Can Run In Parallel With | Fallback Order | Shared Files | Merge Owner | Conflict Risk |
| --- | --- | --- | --- | --- | --- | --- |

## Implementation Slices

### Slice 1: <Name>

#### Goal

#### Allowed Modification Scope

#### Forbidden Scope

#### Execution

- Mode: sequential | parallel-capable
- Depends On:
- Can Run With:
- Must Not Run With:
- Fallback Order:
- Shared Files:
- Merge Owner:
- Conflict Risk: low | medium | high
- Gate Class: simple | standard | boundary-sensitive | high-risk
- Risk Score: 1 | 2 | 3 | 4 | 5
- Gate Reasons:
- Validation Level: slice | group | final
- Recommended Agent Strategy:

#### Steps

#### Validation

#### Done Criteria

#### Rollback Notes

## Parallel Slice Groups

Use this section only for complex tasks that have independent work worth parallel planning.

### Group A: <Name>

#### Members

#### Parallel Eligibility

#### Sequential Fallback Order

#### Merge Rule

#### Conflict Resolution Rule

#### Group Validation

#### Group Done Criteria

## Final Validation

## Documentation Update Requirement

## Risks

Guardrails

  • Prefer small slices.
  • Do not merge unrelated work into one slice.
  • Do not implement code.
  • Use parallel-capable planning only for complex tasks with independent scope and a clear sequential fallback.
  • Do not mark shared-file work as parallel-capable unless the plan names a merge owner and conflict resolution rule.
  • Do not expand the requirement scope.
  • Include validation commands whenever possible.
  • When recording slices in task state or plan artifacts, emit gateClass, risk_score, and gateReasons together.
  • Do not use risk_score to replace gateClass, invent new gate classes, or relax structured artifact shape.

Gate / Stop Condition

  • Stop when requirement scope is still unstable or slice boundaries cannot be defined safely.
  • Stop before coding or when planning would require expanding scope, changing the frozen gateClass vocabulary, or turning risk_score into a replacement for required gates.

Red Flags

  • Large or mixed-purpose slices
  • Shared-file parallel work without a merge owner or conflict rule
  • Missing validation guidance for risky changes
  • Slice definitions that blur allowed versus forbidden scope
  • Slice metadata that omits one of gateClass, risk_score, or gateReasons
  • Numeric scoring framed as a substitute for human review or gate stops

Exit Criteria

  • Each slice has a clear goal and bounded modification scope
  • Execution order, dependencies, and validation level are explicit
  • Gate metadata uses existing gateClass vocabulary and includes supplemental risk_score plus gateReasons
  • The plan is ready for context packing and coding handoff

Handoff

  • Hand the approved slice or parallel group, including gateClass, risk_score, gateReasons, validation guidance, and forbidden scope, to context-pack-builder or the coding workflow