公司规范只约束代码内容,门禁仍按插件执行;MCP token 不入库。 Co-authored-by: Cursor <cursoragent@cursor.com>
194 lines
6.5 KiB
Markdown
194 lines
6.5 KiB
Markdown
---
|
|
name: implementation-slicer
|
|
description: Convert a frozen requirement document or approved refactor scope into small implementation slices with file scope, modification order, validation commands, rollback notes, and done criteria. Use before coding non-trivial features or refactors.
|
|
phase: analysis
|
|
model_requirement: reasoning
|
|
can_edit: true
|
|
risk_level: medium
|
|
---
|
|
|
|
# Implementation Slicer
|
|
|
|
Use this skill to convert a requirement document into executable implementation slices.
|
|
|
|
## When To Use
|
|
|
|
- Use after requirements are frozen or refactor scope is approved.
|
|
- Use before coding non-trivial features or refactors that need bounded slices.
|
|
|
|
## Inputs Required
|
|
|
|
- Frozen requirement document or approved refactor scope
|
|
- Relevant boundary or workflow analysis when available
|
|
- Active task selection from `.task/active.json` when writing artifacts
|
|
|
|
## Steps
|
|
|
|
1. Read the requirement document or approved refactor scope.
|
|
2. Use module-inspector or workflow-inspector when module or workflow scope is unclear.
|
|
3. Identify the smallest safe implementation slices.
|
|
4. For each slice, define:
|
|
- goal
|
|
- allowed files, packages, or directories
|
|
- forbidden files, packages, or directories
|
|
- execution mode
|
|
- gate class
|
|
- risk score
|
|
- gate reasons
|
|
- dependencies and parallel eligibility when the task is complex
|
|
- validation level
|
|
- merge owner and conflict rule when shared files are involved
|
|
- steps
|
|
- validation command
|
|
- done criteria
|
|
- rollback notes
|
|
5. Create or update `.task/<task-id>/implementation-plan.md`, where `<task-id>` is read from `.task/active.json`.
|
|
6. Update `.task/<task-id>/state.json` if the caller asks you to record slices or gates.
|
|
7. Use the active task directory selected by `.task/active.json`.
|
|
8. Do not implement code.
|
|
|
|
## Output Artifact
|
|
|
|
- An implementation plan with bounded slices, validation guidance, and rollback notes in `.task/<task-id>/implementation-plan.md`
|
|
- Optional task state update only when the caller asks to record slices or gates
|
|
|
|
## Gate Class Rules
|
|
|
|
- Use only this frozen `gateClass` vocabulary: `simple`, `standard`, `boundary-sensitive`, `high-risk`.
|
|
- Emit `risk_score` as an integer from `1` to `5` for every slice or approved parallel group.
|
|
- Emit `gateReasons` as short reason labels that explain why the slice should pause or may continue under the selected policy.
|
|
- `risk_score` is stricter supplemental metadata, not a replacement for `gateClass`, required human gates, explicit stop conditions, or critic-required pauses.
|
|
- When `risk_score` indicates higher risk than `gateClass` alone, preserve or strengthen the stop posture rather than weakening it.
|
|
- Calibrate ordinary bounded `standard` slices toward `risk_score` 2-3 unless there is concrete elevated impact, reversibility concern, or validation uncertainty.
|
|
- Use `risk_score` 4-5 only when the slice itself carries elevated safety, compatibility, production, data, security, cross-boundary, or validation risk.
|
|
- Treat these as common higher-risk inputs when assigning or explaining `risk_score`: database schema updates, permissions or security logic, device communication, scheduling, externally committed public API compatibility, build or release scripts, code deletion, dependency upgrades, and production configuration.
|
|
|
|
## Output Document Template
|
|
|
|
```md
|
|
# <Task Name> Implementation Plan
|
|
|
|
## Requirement Source
|
|
|
|
## Scope Summary
|
|
|
|
## Involved Modules Or Areas
|
|
|
|
## Loaded Rules
|
|
|
|
## Loaded Docs
|
|
|
|
## Global Forbidden Scope
|
|
|
|
## Execution Strategy
|
|
|
|
- Complexity: simple | complex
|
|
- Default Execution: sequential
|
|
- Parallel Execution: optional | not-needed
|
|
- Fallback Execution: sequential
|
|
- Merge Owner:
|
|
- Conflict Resolution Rule:
|
|
|
|
## Slice Dependency Graph
|
|
|
|
| Slice | Depends On | Can Run In Parallel With | Fallback Order | Shared Files | Merge Owner | Conflict Risk |
|
|
| --- | --- | --- | --- | --- | --- | --- |
|
|
|
|
## Implementation Slices
|
|
|
|
### Slice 1: <Name>
|
|
|
|
#### Goal
|
|
|
|
#### Allowed Modification Scope
|
|
|
|
#### Forbidden Scope
|
|
|
|
#### Execution
|
|
|
|
- Mode: sequential | parallel-capable
|
|
- Depends On:
|
|
- Can Run With:
|
|
- Must Not Run With:
|
|
- Fallback Order:
|
|
- Shared Files:
|
|
- Merge Owner:
|
|
- Conflict Risk: low | medium | high
|
|
- Gate Class: simple | standard | boundary-sensitive | high-risk
|
|
- Risk Score: 1 | 2 | 3 | 4 | 5
|
|
- Gate Reasons:
|
|
- Validation Level: slice | group | final
|
|
- Recommended Agent Strategy:
|
|
|
|
#### Steps
|
|
|
|
#### Validation
|
|
|
|
#### Done Criteria
|
|
|
|
#### Rollback Notes
|
|
|
|
## Parallel Slice Groups
|
|
|
|
Use this section only for complex tasks that have independent work worth parallel planning.
|
|
|
|
### Group A: <Name>
|
|
|
|
#### Members
|
|
|
|
#### Parallel Eligibility
|
|
|
|
#### Sequential Fallback Order
|
|
|
|
#### Merge Rule
|
|
|
|
#### Conflict Resolution Rule
|
|
|
|
#### Group Validation
|
|
|
|
#### Group Done Criteria
|
|
|
|
## Final Validation
|
|
|
|
## Documentation Update Requirement
|
|
|
|
## Risks
|
|
```
|
|
|
|
## Guardrails
|
|
|
|
- Prefer small slices.
|
|
- Do not merge unrelated work into one slice.
|
|
- Do not implement code.
|
|
- Use `parallel-capable` planning only for complex tasks with independent scope and a clear sequential fallback.
|
|
- Do not mark shared-file work as `parallel-capable` unless the plan names a merge owner and conflict resolution rule.
|
|
- Do not expand the requirement scope.
|
|
- Include validation commands whenever possible.
|
|
- When recording slices in task state or plan artifacts, emit `gateClass`, `risk_score`, and `gateReasons` together.
|
|
- Do not use `risk_score` to replace `gateClass`, invent new gate classes, or relax structured artifact shape.
|
|
|
|
## Gate / Stop Condition
|
|
|
|
- Stop when requirement scope is still unstable or slice boundaries cannot be defined safely.
|
|
- Stop before coding or when planning would require expanding scope, changing the frozen `gateClass` vocabulary, or turning `risk_score` into a replacement for required gates.
|
|
|
|
## Red Flags
|
|
|
|
- Large or mixed-purpose slices
|
|
- Shared-file parallel work without a merge owner or conflict rule
|
|
- Missing validation guidance for risky changes
|
|
- Slice definitions that blur allowed versus forbidden scope
|
|
- Slice metadata that omits one of `gateClass`, `risk_score`, or `gateReasons`
|
|
- Numeric scoring framed as a substitute for human review or gate stops
|
|
|
|
## Exit Criteria
|
|
|
|
- Each slice has a clear goal and bounded modification scope
|
|
- Execution order, dependencies, and validation level are explicit
|
|
- Gate metadata uses existing `gateClass` vocabulary and includes supplemental `risk_score` plus `gateReasons`
|
|
- The plan is ready for context packing and coding handoff
|
|
|
|
## Handoff
|
|
|
|
- Hand the approved slice or parallel group, including `gateClass`, `risk_score`, `gateReasons`, validation guidance, and forbidden scope, to context-pack-builder or the coding workflow
|